About the product
Product Overview
SP-15 consists of a high viscosity, nonylphenol-free, epoxy resin, a thickened, cycloaliphatic amine reactant and a zero, free-silica, powder (PN 1170). This combination, when properly mixed, achieves a non-shrinking patching paste with high compressive and tensile strength and which is easy to shape, sand and grind after initial cure.
Uses
SP-15 is most often used to patch concrete holes, cracks, divots and non-moving joints. It can also be used when a feathered-edge is required for smooth transitions between differing planes.
Preparation
The coating installer should fully read and understand ICRI310.2R-2013 and OSHA 29 CFR 1926.1153 before starting preparatory work. The aim, of preparing a substrate for coating applications, is to roughen the surface, remove weak layers, contaminants, dirt, debris and present a solid, clean, dry substrate for the primer. If unsure as to the level of preparation needed contact Polymer Nation at techservice@polymernation.com
Product Details
For the most up-to-date product details, please view the Product Spec PDF below
PRODUCT PDFName
SP-15
Category
Patching, Joint, Cove
Packaging
0.5 Gallon
Number of Mixes Per Kit
1
A 1 mix kit consists of 32 FL. OZ. A, 16 FL. OZ. B and 1-3 LB. bag of C.
Number of Components
3
Part A - 1 quart, Part B - 1 pint, Part C - 3 lbs. Aggregate
Mix Ratio Liquids by Volume
2:1 see Mixing & Installation
It is always preferred to mix the entire kit, whenever possible, to avoid off-ratio mixtures
Ideal Application Temperatures
60-85°F
Verify that substrate temperature is above 5 degrees of dewpoint during application and cure of material to avoid a potential amine blush
Mixed Viscosity in cP@25C/77F
3500 cP
Liquids only
Working Time
10-15 min
Gel Time
20 min.
Warmer temperatures will decrease gel time and lower temperatures will increase gel time
Dry to Touch
2.5 Hours
Warmer temperatures will reduce time and colder temperatures will increase time
Through Dry
2-4 hrs
Warmer temperatures will reduce time and colder temperatures will increase time
Dry to Walk
4.5 Hours
Warmer temperatures will reduce time and colder temperatures will increase time
Dry to Lightly Use
6-8 hrs
Warmer temperatures will reduce time and colder temperatures will increase time
Full Cure
7 Days
Warmer temperatures will reduce time and colder temperatures will increase time
Shore Hardness at 24 Hours
65
Shore D
Shore Hardness at 7 Days
80
Shore D
Gloss @ 60 Degree Angle
30-40
Applying material close to dew point will decrease gloss and may result in an amine blush
VOC’s of Mixed Material
Near Zero; <50 g/L
EPA Method 24
Color Scale per ASTM D1500
.5-1.0
Clear to slightly amber before filler is introduced
Solids by Volume Mixed
100%
Storage
60F-90F
Store material between 60-90 degrees F in a protected dry location.
Odor
Subtle
Application Thickness in Mils
N/A
N/A
Coverage Per Mix
Approximately 150 linear ft. (1/4" x 1/4" joint)
Disposal
Dispose of material, containers, solvents, etc.per Federal, State and local guideline, rules and laws
Available Colors
Clear and Color Packs
Mixing & Installation
See Technical Data Sheet or contact your local Polymer Nation Distributor
Other Product Names
Polymer Nation believes the information contained herein to be true and accurate. Information contained herein is for evaluation purposes only.
Product HIghlights
Exceptional Performance, Durability, and Safety in Every Application
Most commonly Serviced Markets
Although most our products can be used on any market, we see some common trends between certain products and certain markets.
Available Colors
If you don't see a color you like here, some custom colors can be available upon request. Please contact us for more details!
Product Documentation
PRODUCT PDF.png)



.png)



.png)